Home > Supply of Continuous and Un-interrupted Power to Industries located in the Goindwal Nucleus Industrial Complex – Exemption from Peak Load Hours Restrictions

PUNJAB STATE ELECTRICITY BOARD

P.R.Circular No. 2/2007
Dated: 01.06.2007
From
The Chief Engineer/S.O.&C,
Power Regulation & Control Dte.,
PSEB, 220KV S/Stn., Ablowal, Patiala.
To

1. All EIC/CEs/Distribution in PSEB.
2. Chief Engineer/P&M, PSEB, Ludhiana.
3. Chief Engineer/Enforcement, PSEB, Patiala.
4. All Dy.CEs/SEs/Distribution in PSEB.
5. All Dy.CEs/SEs/P&M in PSEB.
6. All Dy.CEs/Directors/Enforcement & EA&MMTS.
7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further distribution amongst XENs/AEEs/AEs.
8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution along with 5 spare copies.
9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS along with 5 spare copies.

Memo No. 4169/4394/SO/PRC/LD-38 Dated: 1.6.07

Subject: Supply of Continuous and Un-interrupted Power to Industries located in the Goindwal Nucleus Industrial Complex – Exemption from Peak Load Hours Restrictions.

In continuation to this office P.R. Circular No. 02/2001 dated 28.01.2001 & PR Circular No. 20/2004 dated 6.12.04 on above cited subject.
The issue for extension in time for giving exemption from power cut/other benefits has been considered and it has been decided as under:-
No power cut may be imposed up to 31.12.2015 on all new and Old Industrial consumers except during emergency and Peak Load Hours Restrictions.
The new Industrial Units (except Induction and Arc Furnace Consumers) coming after the issue of these revised instructions will be exempted from Peak Load Hours Restrictions and Compulsory Weekly Off-day (if imposed) for a period of 5 years or up to 31.12.2015 which ever is earlier.
The existing Industrial Units (except Induction & Arc Furnace Consumers), which up to 31.12.2010 have been in operation for less than 5 years will be exempted from Peak Load Hours Restrictions & compulsory Weekly off-day (if imposed) till they complete 5 years of their operation.
Peak Load Hours Restrictions and Compulsory Weekly Off-day (if imposed) shall be applicable at par (with the other Industrial consumers of the State) for all other industrial consumers not covered under Sr.No. i to iii. However, these consumers can avail Peak Load Exemption at the same terms & conditions as applicable to any other Industrial Consumer.

Meticulous compliance of these instructions be made.

Director/P.R.& C,
For Chief Engineer/SO&C,
PSEB, Patiala.
Endst.No. SO/PRC Dated:
Copy of the above is forwarded to the following for information & necessary action:
Chairman, All Members, PSEB, Patiala.
Secretary/Board Section, PSEB, Patiala w.r.t. his office UO No. 1066/BD/G-2112/W-55 dated 22.5.07.
Chief Secretary to Govt. Punjab, Chandigarh.
Principal Secretary to C.M. & Power Minister, Punjab, Chandigarh.
Secretary/Power, Govt. of Punjab, Energy Branch, Sectt. Punjab,Chandigarh w.r.t. his memo No. 3/29/2007, Energy Section-4/7103 dated 22.5.07.
Director of Industries & Commerce, Sector-17, Punjab, Chandigarh.
Udyog Sahayak C/O Director of Industries, Udyog Bhawan, 18, Himalaya Marg, Sector-17, Chandigarh.

Director/P.R.& C,
for Chief Engineer/SO&C,
PSEB, Patiala.

Endst.No. /SO/PRC Dated:
Copy of the above is forwarded to Secretary, Punjab State Electricity Regulatory Commission, SCO No. 220-21, Sector-34, Chandigarh for information, please.
Deputy Director/P.R.,
for Chief Engineer/SO&C,
PSEB, Patiala.