Home > Existing Hydel Projects > RANJIT SAGAR DAM (HYDRO ELECTRIC PROJECT)
RANJIT SAGAR DAM (HYDRO ELECTRIC PROJECT) 4 X 150 MW
RANJIT SAGAR DAM PROJECT, SHAHPURKANDI (600 MW):
The earliest recorded proposal of storage on the river Ravi was mooted in 1912 for a 200 ft . high Dam near village Thein. It was inspected by committee headed by Mr. Willey in 1926-27 who had recommended to carry out the survey of the area, but up till 1954 nothing substantial was done except inspections by Geologists. It was in 1957 that the proposal of storage Dam on Ravi River materialized into an Irrigation scheme. The power generation aspect was then postponed to a future date. The first multipurpose project report was submitted to Government of India in 1964. Finally the project was accorded approval by Government of India in April 1982.
Ranjit Sagar Dam (Thein Dam) Project is one of the largest multipurpose river valley project on the river Ravi about 24 KMs up-stream of Madhopur Head Works. It houses four generating units of 150 MW each with total installed capacity of 600 MW. It has firm power of 162 MW at 100% load factor. 4.6% of energy generated is supplied free of cost to H.P. and 20% of energy generated is to be supplied to J&K at the generated cost at the Bus Bar. The Project has been conceived as a peaking station. The power generated is being fed into the existing 220 KV Grid substation at Sarna.
The dates of commissioning unit wise
Unit Number
|
Date of Commissioning
|
I
|
12.8.2000 |
II
|
12.10.2000 |
III
|
20.8.2000 |
IV
|
15.9.2000 |
Name |
Ranjit Sagar Power Plant |
Location |
Shahpurkandi (Pathankot) |
Dam
Maximum Height above river bed
Maximum Height
Level of top |
135.00 m
160.00 m
540.00 m |
Name of Reservoir
Capacity |
Ranjit Sagar
2344 Million Cum (Live storage)
3280 Million cum (Gross storage) |
Water conductor system
A) Tunnels
• Length
• Diameter
• Slope of invert
• Maximum Discharge through the tunnels. |
P-I = 819 M , P-2 = 845M,
12.00 M
Concrete reinforced.
9800 cumecs |
B) Penstocks
• Numbers
• Internal diameter of each
• Maximum discharge capacity
• Number of turbines fed by each penstock |
2 Nos. penstock headers, 4 Nos. penstock branches
5.17M of penstock branch, 8.5M penstock header.
342 Cum/ Sec.
2 Nos |
Turbines
• Number
• Type
• Make
• Net head
• Rated output of each unit
• Normal speed |
4 Nos.
Vertical shaft Francis
BHEL
121.90M (Max.), 76.0M (Min.), 100M (Rated), designed head)
150 MW
166.67 rpm. |
Generators
• Number of Units.
• Make
• Voltage
• Capacity
• Current
• Power Factor
• Speed.
• Excitation system |
4 Nos.
BHEL
13.8 K.V
166.667 MVA
6973 Amp.
0.9Lag
166.67 rpm.
Static |
DETAIL OF STEP -UP TRANSFORMERS
No. of T/Fs |
Voltage class in use |
Voltage Ratio in use. |
Different capacity in use. (MVA) |
No(s) in each capacity size |
Aggregate capacity (MVA) |
12+1(spare) |
220KV |
13.8/220KV
Single phase |
62.5
62.5×12 |
12+1(spare)
62.5 MVA |
750 |
GENERATION ACHIEVEMENTS (In MUs):
2000-2001 |
435.06 MUs |
2001-2002 |
1228.75 MUs |
2002-2003 |
1150.49 MUs |
2003-2004 |
1547.59 MUs |
2004-2005 |
1144.15 MUs |
2005-2006 |
2013.19 MUs |
2006-2007 |
1679.47 MUs |
2007-2008 |
1538.44 MUs |
2008-2009 |
1473.76 MUs |
2009-2010 |
1068.86 MUs |
2010-2011 |
1737.67 MUs |
2011-2012 |
1927.61 MUs |
2012-2013 |
1428.48 MUs |
2013-2014 |
1575.89 MUs |
2014-2015 |
1864.97 MUs |
2015-2016 |
1958.27 MUs |
2016-2017 |
1306.13 MUs |
2017-2018 |
1803.07 MUs |
2018-2019 |
1454.49 MUs |
2019-2020 |
2099.181 MUs |
2020-2021 upto feb 2021 |
1518.939 MUs |
Note:
Ranjit Sagar Power Plant achieved the record generation of 2099.189 MUs in the year 2019-20 since its commissioning, which was the mile stone in the history of RSD Project.