Home > Existing Thermal Projects > Guru Gobind Singh Super Thermal Plant Ropar
Sr. No. Parameter Remarks
1) Location Near Village Ghanauli on Chandigarh/Ropar Nangal Road 12 km from Ropar 55 km from Chandigarh.
2) Main Features
  • Shield & excellent performance by Prime Minister of India during 1986-87 for achieving 78.08 % PLF against all India average of 53.2 %.
  • Incentive award for reducing fuel oil consumption during 1999.
  • Peak load hour generation award during 1999-2000.
3) No. of Power Houses 6
4) No. of Units 6
5) Total generating capacity 6 x 210 MW = 1260 MW
6) Source of water supply From Nangal Hydel Channel
7) Fuel used Coal from coal fields of Bihar, West Bengal and Madhya Pradesh from more than 50 sources called collieries. Distance of these sources is between 1417 km and 1560 km.
8) Turbines 210 MW 3 cylinder mixed flow tandem coupled 3000 rpm BHEL make.
9) Generators 247 MVA, 15.75 kV, 9050 A at 0.85 lag, 50 Hz, 3 phase, double star two pole.
10) Commissioning U1 = 26.9.84  U2 = 29.3.85  U3 = 31.3.88U4 = 29.1.89  U5 = 29.3.92  U6 = 30.3.93
11) Cost of Project
ST – I Rs. 380 Crores
ST – II Rs. 438 Crores
ST – III Rs. 599 Crores
12) Total energy contribution annually 6942 MUs
13) Cost per unit Rs. 1.84/-