1) |
HIGHLIGHTS OF PERFORMANCE DURING 2014-15
|
ACHIEVEMENTS AT GHTP DURING 2014-15
A) Achievement of Units
- GHTP Lehra Mohabbat has contributed a lot to reduce the gap between demand & supply of power in Punjab since its commissioning. Its Units have generated 85987 Million units up to FEB. 2021
|
2) |
No. of Units |
4 |
3) |
Total generating capacity |
Stage-I : 2 x 210 MW = 420 MW
Stage-II : 2 x 250 MW = 500 MW
TOTAL : 920 MW |
4) |
Source of water supply |
Bhatinda Branch of Sirhind Canal. |
5) |
Fuel used |
Primary fuel is Coal from PSPCL’s captive coal mine Pachwara (Central), Pakur (Jarkhand) & Central Coalfields Limited.
Secondary fuel is F.O. & H.S.D. |
6) |
Date of synchronization of Units with coal |
Unit-I = 23.05.98, Unit-II = 26.11.98, Unit-III = 05.02.2008, Unit-IV = 02.08.2008 |
7) |
Energy contribution |
220.8 Lac units daily |