ANANDPUR SAHIB HYDEL PROJECT (134 MW)

Anandpur Sahib Hydel Project is situated about 32 KMs. downstream of Bhakhra Dam towards Ropar side. This Project has been so named due to its vicinity to the famous historic Holy town of Anandpur Sahib, Birthplace of Khalsa . The Town itself is situated on the foot hills of picturesque Shivalik mountainous range and attracts thousands of people all the year around but more so during Holla Mohalla festival in the month of March. The famous Naina Devi temple is also situated nearby atop the hilly peaks of Shivalik. This Project was constructed to utilize additional water of  Bhakhra Nangal System as a result of Interlinking of Beas and Sutlej Rivers at Dehar. This additional water has been utilized for power generation by constructing a new 34 KMs RCC Lined Canal named Anandpur Sahib Hydel Channel with 10,150 cusec capacity, taken off from left Bank of Nangal Reservoir (Nangal Pond) on the Sutlej river. This canal runs almost parallel to Nangal Hydel channel on its left side. The power potential of the Anandpur Sahib Hydel channel has been tapped by constructing 2 No. identical Power Houses  at Ganguwal and Nakkian. The Ganguwal Power House is located approximately 19 KMs downstream (Anandpur Sahib Hydel Channel) Nangal Pond on   its tail race water is taken to Nakkian Power House through a second stretch of approximately 11 KMs Canal. Both the Power Houses have been so located that gross head ( 92.69 Ft .) is equal in both the cases. The tail race water from Nakkian Power House is being led into Sutlej River through Lohand Khud Escape.
Each Power House has been equipped with 2x33.5 MW Generating Sets coupled with Kaplan Turbine Make BHEL Hardwar, are being supplied water through steel penstocks of 6 meters dia. The Hydro Generators are of suspension type having 2 No. Guide bearings. The Turbine governor is of electro-hydraulic type and excitation system is of conventional type with pilot and Main Exciter. The power is generated at 11KV and stepped up at 132 KV, is further fed into Regional Grid for exclusive use of Punjab .
The Power Houses were commissioned during 4/5-1985 and it is being observed that all the 4 No. Machines of both Power Houses are being run satisfactorily since their commissioning on the full/part load as per availability of water, which depends upon the releases from Nangal Pond at Nangal. The requirement of water for full load running of Power Houses is approximately 10150 Cusecs.

The Power Houses of Anandpur Sahib Hydel Project are working quite satisfactorily from the date of commissioning without any major breakdown. Electricity is generated as per availability of water in the AHC. The plant is giving a very good plant availability factor to the tune of 97% on the average

Salient features of the Anandpur Sahib Hydel Project

Sr. No.

 Description of the Generating Units

  PH-I

PH-II

1.

Location

Ganguwal

Nakkian

2.

Capacity

67 MW

67 MW

3.

RD of Canal

18883 Mtrs.

29741 Mtrs.

4.

Date of commissioning

Unit-1=27-4-1985 Unit-II-31.5.1985

Unit-III =19.5.1985
Unit-IV =8.5.1985

5.

Rating of each Unit

33.5 MW

33.5 MW

6.

No of Units of each Power House

2

2

7.

Manufacturer

BHEL Hardwar

BHEL Hardwar

8.

Turbine Out-put

34.5 MW

34.5 MW

9.

Max.. Net Head

30.5 M

30.5 M

10.

Min. Net Head

25.9 M

25.9 M

11.

Designed Net Head

28.0 M

28.0 M

12.

Discharge required per machine for max. generation

5075 Cusecs

5075 Cusecs

13.

Type of Turbine

Kaplan

Kaplan

14.

No. of blades

6

6

15.

Dia of runner

4000 mm

4000 mm

16.

Generator Voltage

11000 Volts

11000 volts

17.

Type of Generator

Vertical Salient Pole

Vertical Salient Pole

18.

Normal Speed

187.5 RPM

187.5 RPM

19.

Direction of Rotation

Clockwise

Clockwise

 

DETAIL OF STEP -UP TRANSFORMERS

No. of Transformer

Voltage  class in use.

Voltage Ratio in  use.

Different capacity  in use.
(MVA)

No(s) in each capacity size.

Aggregate capacity (MVA)

2

2

11/132KV

11/132KV

11/132KV

11/132KV

40
40

2

2

80

80

Total

160

GENERATION ACHIEVEMENTS (in MUs):

Year

Actual Generation ( MUs)

PH-I Ganguwal

PH-II Nakkian

Total

1985-86

250.76

234.03

484.79

1986-87

287.64

282.05

569.69

1987-88

410.24

398.67

808.91

1988-89

371.40

371.01

742.41

1989-90

382.64

369.61

752.25

1990-91

331.17

328.18

659.35

1991-92

440.35

433.56

873.91

1992-93

444.31

434.80

879.11

1993-94

322.52

317.09

639.61

1994-95

458.43

449.47

907.90

1995-96

483.28

479.80

963.08

1996-97

480.80

479.32

960.12

1997-98

290.62

288.44

579.06

1998-99

540.72

530.97

1071.69

1999-2000

418.84

417.87

836.71

2000-2001

324.78

326.90

651.68

2001-2002

256.43

253.68

510.11

2002-2003

375.41

374.14

749.56

2003-2004

414.44

414.88

829.31

2004-2005

276.55

280.74

557.29

2005-2006

378.25

373.37

751.62

2006-2007

347.159

344.862

692.021

2007-2008

387.28

381.32

768.60

2008-2009

378.532

372.960

751.492

2009-2010

362.329

335.027

697.356

2010-2011

395.950

392.248

788.198

2011-2012

419.555

418.296

837.851

2012-2013

319.908

319.591

639.499

2013-2014

369.12

365.88

735.00

2014-2015

312.494

302.422

614.923

2015-2016

334.775

333.765

668.53

Note:-The Anandpur Sahib Hydel Project achieved the record generation of 1071.69 MUs in the year 1998-99 since its commissioning, which was the mile stone in the history of Anandpur Sahib Hydel Project.