Sr. No.
|
Circular No.
|
Date of Issue
|
Subject of the Circular
|
1.
|
1 / 2011 | 19-01-2011 | Power Regulatory measures on industrial consumers |
2.
|
2 / 2011 | 21-01-2011 | PR Circular 1/2011 Amendment there of |
3.
|
3 / 2011 | 21-01-2011 | Power Regulatory Measures on Industrial Consumers Availing Open Access |
4.
|
4 / 2011 | 21-01-2011 | Proper Implementation of power cuts to be imposed by Power Control Centre |
5.
|
5 / 2011 | 04-02-2011 | Peak Load Exemption Charges for Open Access consumers for the period 28.9.2010 to 29.9.2010. |
6.
|
6 / 2011 | 12-05-2011 | Regulatory measures on Industry. |
7.
|
7 / 2011 | 19-05-2011 | Grant of Peak Load Exemption to General Industrial Consumers. |
8.
|
8 / 2011 | 30-06-2011 | PR Circular No.4/2011 dt.21.1.11 issued vide memo No. S923/1063/PPR/PR/LD-38 dated 21.1.11. |
9.
|
9 / 2011 | 04-07-2011 | Regulatory measures on Industry. |
10.
|
10 / 2011 | 03-08-2011 | Regulatory Measures on Industry July 2011. |
11.
|
11 / 2011 | 07-09-2011 | Regulatory measures on Industry August, 2011. |