CIN No.: U40109PB20108GC033813

Guru Nanak Dev Thermal Plant Bhatinda

1) Location Bhatinda (Punjab)
2) Main Features
  • Highest Generation achievement
  • Lowest ever yearly auxiliary consumption
  • Lowest D.M water make up
3) No. of Power Houses 4
4) No. of Units 4
5) Total generating capacity 4 x 110 MW = 440 MW
6) Source of water supply Canal water
7) Fuel used Bituminous coal with calorific value 3500-4500 kcal/kg and Oil F.O./L.D.O. 25000-30000 klits/year
8) Turbines Three casing type impulse turbines 110 MW capacity with 3000 rpm, 29 stages with exhaust pressure 0.08 kg/sq. cm
9) Generators BHEL make three phase synchronous type with H2 cooling and DC exciter 110 MW capacity 11000 volts
10) Commissioning U-1 = 22.9.74   U-2 = 19.9.75U-3 = 29.3.78   U-4 = 31.1.79
11) Cost of Project 115 crores
12) Total energy contribution annually 2266 MUs
13) Cost per unit Rs. 1.97/-

Performance Data/Highlights of GNDTP BTI for The Year 2002-03

Sr. No.      Parameter          2002-03                    Remarks

  1. Generation            2498.76 MU               Deemed generation works

                                                                                         out to be 2761.53 MU?s

                                                                               after including backdown

                                                                               loss (189.88 MU?s) and

                                                                          coal shortage loss (72.89 MU?s).

  1. PLF                         64.83 %                   Deemed PLF works out

                                                                                            to be 71.65 %.

  1. Availability                        82.53 %                       ———–

             Factor

  1. Coal Cons.                      1762950 MT

0.706 Kg/Kwh            Lowest consumption during

last 23 year at plant.

  1.  Fuel oil                        1.35 ml /Kwh           Lowest consumption

consumption                                                       since inception of plant.

  1. Auxiliary                        9.32 %                        ——-do——

consumption

  1. D.M.Water                     3.35 %                         —————-

make up

  1. Heat Rate                      2864.73                        Lowest during last

13 years at plant.

Performance Data/Highlights of GNDTP BTI for The Year 2003-04 & 2004-05

SNo.   Parameter    2003-04         2003-04         Remarks

  1. Generation    2551.31 MU     1992.49 MU      Unit-2 remained under

                                                                                            R&M throughout the

                                                                                            year 2004-05

  1.  PLF                       66.01 %       51.69%(68.93%

                                                            with 3 units)       

  1. Availability            84.07%        62.66%(83.55 %

      Factor                                              with 3 units)

  1. Coal Cons.   18,30,084 MT            14,76,983 MT

0.72 Kg/Kwh             0.74 Kg/kwh

  1. Fuel oil         1.66 ml /Kwh             1.46  ml/kwh

consumption

  1. Auxiliary                 9.54 %                 11.23%

consumption

  1. Tr.& Ex.Losses       ______                    1.00%
  2. D.M.Water               3.70 %                    2.02%

make up

  1. Heat Rate     2838.45 K.cal/kwh    2898.99 K.cal/kwh

Director/F&E

GNDTP, Bathinda

DISTRIBUTION RETURNS