Mukerian Hydel Project Stage – I

MUKERIAN HYDEL PROJECT, STAGE-I (207 MW)

Mukerian Hydel Project is one of the main Hydro Electric Projects in the Northern Region situated in the Hoshiarpur District of Punjab. The Mukerian Hydel Project is run of the river project, constructed at Mukerian Hydel Channel emanating from Shah-Nehar Barrage  constructed  down stream of Pong Dam on River Beas . The Barrage has 52 gates and a small artificial lake of holding capacity 3404 acres feet to feed the Mukerian Hydel Channel. Mukerian Hydel Channel is 37 Km .long and lined with Cement Concrete and having maximum water carrying capacity of 11500 cusecs. The Mukerian Hydel Project comprises of 4 No. Power Houses. Power House No. 1 & 2 have 6 Nos (3 at each Power House). Machines of 15 MW capacity each whereas Power House No.III & IV have 6 No. (3 at each Power House) machines of 19.5 MW capacity each. The total generating capacity is 207 MW of all the 12 No. Machines.The Power Houses are situated at different reduced distances (RD’s) of the channel and located as mentioned below:-

Description PH-I PH-2 PH-3 PH-4
Capacity 45MW 45MW 58.5MW 58.5MW
R.D. 6365Mtrs. 16004 Mtrs. 18879 Mtrs. 27404Mtrs
Location Talwara Hazipur Ralli Uchi-Bassi

Salient features of the Mukerian Hydel Project are given as under:-

Sr. No. Description of the generating units PH No.1&2 PH No.3&4
1 Rating of each units 15 MW 19.5 MW
2 No. of Units at each PH. 3 No. 3 No.
3 Manufacturer BHEL Bhopal BHEL Haridwar.
4 Turbine Output 21000HP 27300HP
5 Max.Net Head. 17.5 Mrs. 22.5Mtrs.
6 Min.Net Head 16.5 Mtrs. 21.95Mtrs.
7 Rated Net Head 16.8 Mtrs. 21.95 Mtrs.
8 Discharge required per M/c for max. generation. 3708 cusec 3701 cusec.
9 Type of Turbine KAPLAN KAPLAN
10 No. of blades. 6 6
11 Dia. of runner 3962mm 3650mm
12 Generator voltage 11000 Volts 11000 Volts.
13 Type of generator Vertical, salient pole  Umbrella type. Vertical salient pole Umbrella type.
14 Normal speed 150 RPM 166.7 RPM.
15 Direction of rotation Clockwise Clockwise
 

DETIAL OF STEP-UP TRANSFORMERS

No. of Transformer Voltage Ratio in  use. Different capacity  in use.(MVA) No(s) in each capacity size. Aggregate capacity (MVA)
3
3
3
3
2
11/132KV
11/132KV
11/132KV
11/132KV
132/66KV
16.667
16.667
25
25
50
3
3
3
3
2
50.001
50.001
75
75
100
                                                  Total 300.002MVA

The dates of commissioning Unit wise are as under: –

Name of PH Unit No. Date of Commissioning Date of synchronization Date of commercial operation
MPH-I
Unit-I
Unit-II
Unit-III
 

02.10.1983
14.10.1983
26.11.1983

 

02.10.1983
14.10.1983
26.11.1983

 

02.10.1983
14.10.1983
26.11.1983

MPH-II
Unit-IV
Unit-V
Unit-VI
 

05.05.1988
03.06.1988
28.02.1989

 

18.05.1988
03.06.1988
28.02.1989

 

18.05.1988
03.06.1988
28.02.1989

MPH-III
Unit/VII
Unit-VIII
Unit-IX
 

11.11.1988
26.01.1989
10.03.1989

 

29.03.1989
22.03.1989
22.03.1989

 

29.03.1989
22.03.1989
22.03.1989

MPH-IV
Unit-X
Unit-XI
Unit-XII
 

25.12.1988
10.03.1989
01.04.1989

 

22.03.1989
22.03.1989
25.05.1989

 

22.03.1989
22.03.1989
25.05.1989

The generating Units at each Power House can be put in service with minimum flow of 1600 cusec. The Mukerian Hydel Project generates electrical energy at 11 KV and after stepping up to 132 KV, the same is transmitted to Grid system at 132 KV. Power House No. I, is connected with Power House No.II and Power House No.II with PH No. III and PH No. III with PH-IV through 132 KV double circuit lines carried on towers. There are four 132 KV circuit lines  for evacuation of electric energy generated, two numbers at PH-II to Jallandhar (through 132 KV Bhogpur and 132 KV Tanda circuits) and other two at PH-IV through 132 KV Sri-Hargobindpur Circuit I&II.
GENERATION ACHEIVEMENTS (In MUs):

Year Actual Generation (In MUs)
MHP-I MHP-II MHP-III MHP-IV Total Gen. (In MUs)
1988-89 222.69 3.35 226.04
1989-90 277.37 202.45 330.81 326.69 1137.32
1990-91 299.24 244.21 313.61 311.45 1168.51
1991-92 265.51 243.45 317.64 313.26 1139.86
1992-93 245.17 234.36 307.02 305.88 1092.43
1993-94 253.53 248.26 318.76 314.25 1134.80
1994-95 284.24 293.26 377.03 375..85 1330.38
1995-96 314.45 309.63 322.18 398.53 1344.79
1996-97 277.69 285.01 348.16 363.98 1274.84
1997-98 287.29 297.08 377.25 377.85 1339.47
1998-99 326.23 337.15 435.03 430.03 1528.44
1999-2000 331.05 341.16 435.51 439.10 1546.82
2000-2001 266.16 270.38 351.41 332.92 1220.87
2001-2002 255.32 257.12 331.44 322.70 1166.58
2002-2003 178.35 171.86 224.96 220.34 795.51
2003-2004 226.42 224.83 290.59 287.39 1029.23
2004-2005 191.30 177.44 225.19 227.68 811.62
2005-2006 272.36 251.39 357.14 357.36 1238.25
2006-2007 260.644 226.236 344.850 339.005 1170.735
2007-2008 292.72 295.97 390.16 383.05 1361.90
2008-2009 250.21 250.62 322.74 308.29 1131.861
2009-2010 195.89 192.74 249.80 247.66 885.94
2010-2011 233.54 230.61 303.73 30.85 1069.73
2011-2012 287.45 295.53 389.95 384.81 1357.74
2012-2013 308.52 306.82 397.27 408.20 1420.81
2013-2014 269.62 269.34 356.89 350.89 1246.74
2014-2015 230.766 235.552 274.798 306.098 1047.21
2015-2016 261.485 2687.519 290.512 348.924 1169.45

NOTE:- The Mukerian Hydel Project has achieved the record generation of 1546.82 MU’s in the year 1999- 2000 since its commissioning, which was the milestone in the history of Mukerian Hydel Project