U.B.D.C POWER HOUSES, STAGE-I & II (91.35 MW)

Upper Bari Doab Canal Hydro Electric Project (UBDC) is located near Pathankot in Punjab . There are three  Power Houses  situated on this  Canal fed from Madhopur  head Works on  river Ravi. This Project comprises of two stages of Hydro Power stations. Both stages have one generating unit at each Power House having a generating unit of 15MW was commissioned during 1971-73. Stage-II of  having a generating unit  of 15.45 MW  was erected and commissioned during 1989-92. The two stages of UBDC Hydro Electric Project have  a total installed capacity of 91.35 MW.

The  locations of Power Houses on  the channel are as under: -

Sr. No.

Description

UBDC Stage-I

UBDC Stage-II

1.

Capacity

3X15 = 45 MW

3X15.45 = 46.35

2.

RD/ Locations

PH-I 13500 ft./Madhopur
PH-II 24750 ft./Sujanpur
PH-III 40000 ft./Sarna

PH-I 13500 ft./Madhopur
PH-II 24750 ft./Sujanpur
PH-III 40000 ft./Sarna

Salient features of the UBDC

Sr. No.

Description of the generating units

UBDC Stage-I

UBDC Stage-II

1.

Rating of each unit

15 MW

15.45 MW

2.

No. of units of each PH

3 Nos.

3 Nos.

3.

Manufacturer

1 No. AEI ( UK )
2 No. BHEL

 All 3 No. BHEL

4.

Turbine out put

21000 HP

21340 HP

5.

Max Net Head

18.3 M

18.3 M

6.

Min. Net Head

14.8 M

14.8 M

7.

Rated Net Head

17.1 M

17.1 M

8.

Discharge required per m/c for max. Generation

3625 Cs

3625 Cs

9.

Type of turbine

KAPLAN

KAPLAN

10.

No. of Blades

6

4

11.

Dia. of Runner

3962 mm

3900 mm

12.

Generator Voltage

11000 Volts

11000 Volts

13.

Type of Generator

Vertical Shaft

Vertical Shaft

14.

Normal speed

150 RPM

166.7 RPM

15.

Direction of Rotation

Clock wise

Clock wise

DETAIL OF STEP -UP TRANSFORMERS

Power House

No. of T/F both for stage -I &II

Voltage Ratio in  use.

Different capacity  in use.
(MVA)

No(s) in each capacity size.

Aggregate capacity MVA.

 P.H.1

2

11/132KV

20
25

1
1

45

 P.H.2

2

11/132KV

16.667
20

1
1

36.667

 P.H.3

2

11/132KV

16.667
20

1
1

36.667

                                            Total

118.334MVA

Commissioning dates of UBDC PHs

Power House Number

Stage-I

Stage-II

1

1. 30.08.1971

1. 06.08.1989

2

2. 24.05.1972

2. 26.06.1991

3

3. 12.04.1973

3. 01.01.1992

P.S.E.B (now PSPCL)  had to  incur  an expenditure of 18.28 crore through Pb. Irrigation department for re-modelling of escape channel at RD- 72720 to enhance its capacity from 1500 Cusses to 7200 Cusses. This work was  completed in 7/2004 due to which full  generation from UBDC PHs  became possible during lean period when Irrigation Indent is NIL. All the three old and sluggish governors of Stage-I machines have been replaced with the new Micro processor based  governors at a cost of 3.07 Crore during the year 2010-11.
        The case for capital mtc. of stage-I  machine of power house no.1 is under process. The annual mtc. of machines is done regularly.

GENERATION ACHIEVEMENTS (In MUs):

Year

Actual Generation (In MUs)

UBDC Stage-I

UBDC Stage-II

Total Generation (MU's.)

1988-89

206.51

-

206.51

1989-90

198.30

2.57

200.87

1990-91

152.91

47.82

200.73

1991-92

178.16

74.72

252.88

1992-93

144.83

122.81

267.64

1993-94

126.07

128.50

254.57

1994-95

133.75

154.00

287.75

1995-96

114.28

154.87

269.15

1996-97

131.84

142.37

274.21

1997-98

85.80

120.97

206.77

1998-99

131.07

124.83

255.90

1999-2000

137.35

181.42

318.77

2000-2001

155.89

190.16

346.05

2001-2002

114.11

206.28

320.39

2002-2003

168.90

224.87

393.77

2003-2004

190.90

236.54

427.44

2004-2005

171.27

208.40

379.67

2005-2006

250.14

280.49

530.63

2006-2007

158.711

225.891

384.602

2007-2008

184.281

243.751

428.032

2008-2009

140.70

198.85

339.55

2009-2010

142.00

194.60

336.60

2010-2011

165.62

244.38

410.00

2011-2012

138.90

156.56

295.46

2012-2013

142.668

175.769

318.437

2013-2014

194.775

166.849

361.624

2014-2015

155.95

227.92

383.87

2015-2016

116.39

203.61

320.00

Note:
UBDC Stage-I&II Project achieved record generation of 530.62 MUs in the year 2005-06 since its commissioning.