Name of the Organization: Transmission Lines .

Address of main office: Chief Engineer/TL,

B-2, Shakti Vihar,

PSEB, Patiala .

Phone No. : 0175-2303676

FAX No. : 0175-2301536

 

Transmission Lines Organization came into existence in July, 1998 after bifurcation of Transmission System Organization for execution of 66/132/220KV Transmission lines. The chart of organization is as under:

 

 

Main works execution wings of this organization are as under:

•  SE/TLSC Circle , Patiala - execution of Transmission lines primarily in Central and South Zone.

•  SE/TLSC Circle , Jalandhar - execution of Transmission lines primarily in Border, North & West Zone.

•  Director/Trans. Design, Patiala - approval of Route plans of Transmission lines submitted by above offices & procurement of all material required for Transmission Lines.

Functions of Transmission Lines Organization:

  Transmission lines organization has been assigned the work of construction of 66/132/220KV Transmission lines and up-gradation/augmentation of 33KV lines to 66KV lines.

Works are carried out as per list of works approved by CE/Planning. In addition to the above, 66/132/220KV lines are also being constructed for Private Consumers and also to restore supply which gets disturbed during natural calamities/heavy storms.

  Year wise Progress of Transmission Lines

 

Sr. No.

Year

220KV Lines (ckm)

132KV Lines (ckm)

66KV Lines (ckm)

33/66KV

 

(ckm)

Total

 

(ckm)

1

1997-98

225.592

11.006

179.052

45.856

461.506

2.

1998-99

532.99

23.642

213.904

35.877

806.413

3.

1999-2000

132.736

15.422

237.542

35.678

421.378

4.

2000-01

281.977

42.393

212.495

39.518

576.383

5.

2001-02

111.35

13.286

177.043

48.578

350.257

6

2002-03

129.405

24.057

44.01

10.783

208.255

7

2003-04

137.915

14.971

148.352

47.142

348.38

8.

2004-05

88.814

17.366

183.958

40.01

330.148

9.

2005-06

193.287

13.578

203.126

67.105

477.096

10

2006-07

79.650

14.604

507.318

-

601.572

11

2007-08

79.968

15.735

611.087

1.149

707.939

12

2008-09

158.654

13.167

436.768

1.900

610.489

13

2009-10

Up to 7/09

14.590

21.424

138.610

-

174.624

 

Transmission Lines completed by TL Organization, Patiala during 2008-09

(A) 220KV Lines

(I) 220KV Planned Works

•  220KV Moga-220KV Bagha Purana DC line.

•  220KV Moga-Jagraon line ? diversion to 400KV S/S Moga.

•  220KV Khassa-Balachak (PGCIL) (DC) line

•  220KV GNDTP-Mukatsar SC on DC towers line.

•  LILO of one ckt. of 220KV Mohali-1 Dera Bassi line at Mohali-II.

•  LILO of one ckt. of Gobindgarh-1 to Gobindgarh-II at Amloh Road , Gobindgarh.

•  LILO of one ckt. each of existing 3 Nos. 220KV DC line at 400KV S/Stn. Ludhiana 220KV Lalton Kalan Jagraon

•  Stringing of 2 nd ckt. of 220KV Mohali-Dera Bassi line.

(II) 220KV Departmental Deposit Works

  Breakdown of 220KV Mahilpur-Jamsher line DC.

  1. 200KV Ablowal-Rajpura DC line (Restoration of supply) tower fallen on 24.6.08 due to storm.
  2. Breakdown of 220KV Sarna-Wadala Granthian line T. No. 103 (9/2008).
  3. Breakdown of 220KV Sarna-Wadala Granthian line T. No. 103 (10/2008).
  4. Breakdown of 220KV RTP-Jamsher DC line T. No. 113 to 116.

(III) 220KV Private Deposit Works

  NIL

(B) 132KV Lines

(I) 132KV Planned Works

  132KV LILO of Jalandhar-Kapurthala line at 132KV Children Park Jalandhar.

  (II) 132KV Departmental Deposit Works

  Shifting of 132KV LILO line at 220KV Yard Baghapurana

  1. Resagging of 132KV APH-Nawanshahar line for Jadla due to breakdown of 220KV RTP-Jamsher line.
  2. Resagging & re-erection of damaged peak of X Arm of TL-132A of 132KV Jalandhar-Dhilwan & 132KV Kartarpur-Butari.
  3. Breakdown of 132KV Verpal-Hakima Gate.

(III) 132KV Private Deposit Works

132KV Khera Mandir to Rail Coach Factory Kapurthala.

(C ) 66KV Lines

(I) 66KV Planned Works

•  66KV Patti-Kacha Pacca.

•  66KV Janer to Khosa Kotla.

•  66KV Dharamkot-Janer.

•  66KV line from 220KV Patran to 66KV Khanouri with existing T-off for 66KV Shatrana.

•  66KV T-off from132 KV Kharar-Morinda Kajoli line to be reused at Gharuan.

•  66KV link line from 220KV S/S Tibber to connect existing Purana Shaila-Bhaini Mian Khan line DC on DC.

•  66KV Ubhewal 66KV Mangwal ( Patiala Road Sangrur) SC on DC.

•  66KV Rakhra-Surajpur line SC on DC Tower.

•  66KV line T-off for Benra (Mana Wala) from 220KV Dhuri to Kanjala SC on DC Towers

•  (i) T-off 66KV Samadh Bhai-Bhagta Bhaika for Sukhanand SC on DC.

(ii) Resagging.

•  66KV Rampura Phul-Jethuke line.

•  66KV Chogawan-Kokri Vehniwal line.

•  66KV T-off 132KV Kathunangal-Tarsika line for Dhade.

•  (i) 66KV T-off line from 220KV Fatehgarh Churian-Majitha line for 66KV Wadala Veeram.

(ii) Resagging.

•  (i) 66KV T-off Badshahpur-TV Centre line at Boota Mandi-Chara Mandi Jalandhar.

(ii) Resagging.

•  (i) 66KV Bhikhi-Hamirgarh-Dhapai.

(ii) 2 nd Ckt. on existing line.

(iii) Resagging

•  66KV Ferozeshah to Lohgarh Thakran SC on DC.

•  T-off 132KV Gurdaspur-66KV Kahnuwan line for Babehali.

•  66KV T-off from 66KV Sarna-Dina Nagar line at suitable place near Tower No. 69 for Taragarh.

•  220KV Dhuri-66KV Bhasaur SC on DC.

•  T-off one ckt. of 220KV Sangrur-66KV Bhawanigarh line for Kapial SC on SC.

•  132KV Bagha Purana-66KV Gajjanwala line.

•  66KV Mandvi-Ghamurghat SC line (Re-erection of TL-12 & Resagging).

•  132KV Badal-66KV Nandgarh (Ghuda) line.

•  66KV line from Ranjit Avenue-Kacheri Chowk, Amritsar .

•  66KV T-off Kapurthala-Tibba line for 66KV Khallu.

•  Up-gradation of 33KV Dalla-Ramuwala line.

•  Up-gradation of 33KV Moga-Kishanpura line.

•  Up-gradation of 33KV Mahilpur-Shaila Khurd line.

•  Up-gradation of 33KV to 66KV Ropar-Pukhrali line.

•  Up-gradation of 33KV Mahilpur to Bham line to 66KV on existing HRP Strs.

•  132KV Goraya-33KV Rurka Kalan line (Up-gradation to 66KV).

•  220KV Sangrur to 66KV Bhawanigarh line ckt. No. 1. (Replacement of conductor 0.125 Sq. ? to ? 0.15Sq.?).

•  Shifting of 2 Nos. towers of Passiana-Gajjumajra-Bhawanigarh line

•  Replacement of 9 Nos. towers of Jalandhar-Phagwara line SC on SC.

(II) 66KV Departmental Deposit Works

  •  LILO of damaged tower of old 66KV Sahnewal-Latala line.

•  Shifting of 66KV line at proposed 220KV S/S Baghapurana.

•  (i) Shifting of 66KV Malout Road Bathinda line at 220KV S/S Bathinda.

(ii) Resagging.

•  Resagging of 220KV Patran-Kakrala DC line linked with 220KV Sangrur-66KV Bhawanigarh ckt.-I upto Str. No. 37 (Repl. Of conductor).

•  (i) Raising of 66KV Mukatsar-Ganga Nagar line & 66KV Bhiwani Cotton Mill Abohar line.

(ii) Resagging

•  Breakdown of 66KV Ladhuka-Chack Budhake.

•  Breakdown of 66KV Abohar-66KV Bhiwani Cotton Mill Abohar.

•  Permanent restoration of supply of 66KV Rajpura-Banur DC on DC.

•  Permanent restoration of supply of Bahadurgarh-Rajpura line SC on DC.

•  Restoration of supply of 66KV Ablowal-DCW line.

•  Restoration of supply of 66KV Ablowal-Baran line SC on DC Towers.

•  Restoration of supply of 66KV Rajpura-Banur DC on DC.

•  Restoration of supply of Bahadurgarh-Rajpura line SC on DC.

•  Temp. restoration of supply of Bahadurgarh-Rajpura line.

•  Temp. restoration of supply of 66KV Rajpura-Banur DC on DC.

(III) 66KV Private Deposit Works

•  66KV S/Stn. Khamano-Bio Mass based Power Plant of M/s Laxmi Energy Food Ltd. (Part-I & Part-II).

•  66KV Sujanpur MES Pathankot.

•  66KV line from 132KV S/S Doraha to 66KV S/S M/s Kaur Sain Spinners Ltd.

•  66KV line for Mukesh Udyog Ltd. by tapping already existing 66KV line for M/s Maha Laxmi Steel Budhewal.

•  66KV line from Machiwara to M/s Adhunik Alloys.

•  66KV Lubanian Wali-M/s Satia Synthetics.

•  66KV SC line on DC towers from 220KV S/Stn. Gobindgarh-II to M/s R.P. Multimetal & M/s Vimal Alloys Sirhind.

•  66KV line from 66KV S/Stn. Badinpur to the premises of M/s Nahar Sugar Mills, Amloh.

•  66KV Jodhpur Pakhar-GGS Refinery Ramsar line.

•  66KV line from M/s Wahid Sandhar Sugar Ltd. Phagwara to HSP Road , Phagwara.

•  Modification of Rly-Xing of 132KV Hoshiarpur-Hamirpur line at Km 44.180.

•  Aug. of 66KV line on Rail Pole for Modern Steel Ltd. Mandi Gobindgarh.

•  (i) Shifting of 66KV Ablowal-Baran line in joint venture Project between PDA & OMAX Ltd. at Village Baran.

(ii) Resagging.

•  (i) Shifting / rerouting of 66KV Indl. Area Phase-IX-E S/Stn. from NIPER Campus Sector-67, Mohali.

(ii) Resagging.

•  (i) Shifting of 66KV Butrari-Beas line from National Highway -I at Km 416.00.

(ii) Resagging.

•  Shifting of 66KV Dasuya-Miani line at Km 54.00 of National Authority of India.

•  Shifting of existing 66KV Sirhind-Bassi Pathana SC line on R.P. Strs. From the site of /Sri Guru Granth Sahib Univerysity.

•  Shifting of 66KV Kharar-Banur line within the plot of Pearls City Site, Sector-104, Mohali.

•  Shifting of 66KV Jodhpur Pakhar-GGS Refinery line from the Marriage Palace of Sh. Lakhbir Singh.

(D) 33KV Lines

  (I) 33KV Planned Works

NIL (33KV Planned works are NIL as PSEB is adopting 66KV as Sub-Transmission voltage level against 33KV and up-grading the existing 33KV lines to 66KV in a phased manner)

(II) 33KV Departmental Deposit Works

NIL

(III) 33KV Private Deposit Works

  Shifting of 33KV Pathankot-Mirthal line at Km 96.130

  1. Shifting of 33KV Pathankot-Dhar & Pathankot-Mirthal lines from land of S. Harbans Singh , Jodha Mal Colony, Pathankot.
  2. Shifting of 33KV Bhogpur-Alawalpur line due to modification of Rly. Xing.
  3. Shifting of 33KV Pathankot-Mirthal line at Km 110 of NHAI.

•  Transmission Lines completed by CE/TL, Patiala during 2009-10

( During 4/09)

•  66KV T-off Kotkapura-I-Faridkot for 66KV Baba Sheikh Farid

(SC on DC).

•  66KV Mallanwala-Kamala Midhu SC on SC.

•  66KV Jakhopur-Kohar Kalan.

•  66KV line from 220KV S/Stn. Sahnewal for Vallabh Steel, Ludhiana .

•  LILO of one ckt. of 220KV Moga-Jagraon DC line at Ajitwal.

•  LILO of 132KV Moga-Samadh Bhai at Gholian Kalan on DC Towers.

•  LILO of 66KV Patti-Toot line at 66KV Dubli.

•  LILO of 66KV Badshahpur-Maqsoodpur line at Patel Chowk.

•  T-off of 132KV Maur-Jogarala line for Burj Dhilwan SC on DC.

(During 5/09)

•  66KV Mubarikpur-Dhakaula S/C on D/C.

•  T-off 132KV Ghulal ?Gobindgarh-II line for 132KV Seh.

•  LILO of existing 220KV Mohali-I-66KV Anand Lamp Line at Mohali-II.

•  66KV line from Ferozepur Road Ludhiana to Rajguru Nagar Ludhiana.

•  66KV Mansa-Bhdhladha-2 nd ckt.

( During 6/09)

•  LILO of 220KV Fatehgarh Churrian Civil Line Amritsar at 220KV Majitha.

•  T-off 66KV Badal-Dhabwali Line for Banwala Nukka.

•  66KV Kauni-Bhuttiwala Line.

•  T-off of 66KV Patti-Harikia Line for Pringari.

•  66KV Patti-Toot Line.

(During 7/09)

•  66KV Line from 220KV Rajla to joint with 66KV Kakrala-Samana D/C Line.

•  Stringing of 2 nd ckt. from 220KV Sunam to 66KV Lehragaga Line upto T-off Point for Chajjli.

•  66KV Line to join one idle ckt. from 66KV S/S Sunam from Dead end Tower with Dead end Tower of 66KV Line from 66KV Nagra.