INSTALLED CAPACITY & GENERATION

Position Ending 31.3.2015

S. No.

Name of Project

Detail of Power machines with installed capacity (MWs)

Share of Punjab (MWs)

Gross Generation during the year 2014-15

I

OWN PROJECTS

a)

HYDRO ELECTRIC PROJECTS

1

Shanan PHs

4X 15+1X50=110.00

110

507.8

2

UBDC

3X15+3X15.45 =91

91

383.88

3

Mukerian

6X15+6X19.5=207.00

207

1047.21

4

Anandpur Sahib

4X33.5=134.00

134

614.92

5

RSD

4X150=600.00

452.4

1864.97

6

Nadampur Micro

2X0.4=0.80

0.8

7.33

7

Daudhar Micro

3X0.5=1.50

1.5

8

Rohti Micro

2X0.4=0.80

0.8

9

Thuhi Micro

2X0.4=0.80

0.8

10

GGSSTP ROPAR(micro)

2x0.85

1.7

Total

1000.00

4426.11


b)

THERMAL PROJECTS

No.& Capacity of units(MW)

Total Capacity (MW)

GROSS GENERATION during the year 2014-15 (Mus)

1

GNDTP, BATHINDA

2x120+2x110 =460.00

460

1432.74

2

GGSSTP, ROPAR

6x210 =1260.00

1260

5751.42

3

GHTP, Lehra Mohabat

2x210+2x250=920

920

4507.84

Total Thermal

2640

11692.00

Hydel

1000

4426.11

Total hydro +Thermal (a + b)

3640

16118.10

II

Share From BBMB Pojects

1161

3838.81

III

Import (Including Share from Central Sector Projects)

3610

21361.23

IV

Independent Power Producers (IPP) 2060 6685.80

V

Cogeneration (PEDA & Captive Power Plants & Jalkheri)

583

714.56

G.Total (I+II+III+IV)

11054

48718.50