Acheivements -Border Zone,Amritsar

1. Total No. of Connections/Connected Load

Sr.No. Category No. of Connections Connected load (in KW)
1

DS

872441
1344979
2

NRS

156170
420103
3

SP

19563
178772
4

MS

2792
148879
5

LS

463
255142
6

SL

320
6135
7

BS

178
63728
8

AP

231478
1134505
9.

RT

1
10800
 

TOTAL

1283406
3563043

 

2.Release of Connections

Sr.No. Category 4/09 to 11/09 During 12/09 Upto 12/09
1
GSC
34114
2201
36315
2
ISC
306
52
358
3
AP
1888
865
2753
4
Others
187
25
212
  Total
36495
3143
39638

 

3. Pending Test Reports Ending 12/2009

Sr.No. Category Pending Test Reports (No.) Date of oldest Pending Test Report
1
GSC
13123
10.8.09
2
ISC
50
13.11.09
3
AP
5610
21.4.06
Total
18783
21.4.06

4. Grid Sub Station

Sr.No. Description No. Installed Capacity                            (in MVA) No. Installed Capacity                            (in MVA)
During 12/09 upto 12/09
1
220 KV
0
0
0
0.00
2
132 KV
0
0
0
0.00
3
66 KV
0
0
102
2005.95
4
33 KV
0
0
4
22.00
Total
0
0
106
2027.95

5.

Sr.No. Description (Length) Length of lines (in KMs)
upto11/09 During
12/09
upto 12/09
1
11 KV
23980
790
24770
2
LT
35727
-297
35430

6. Deloading of Distribution T/F's

Sr.No. Capacity of DS T/F  No. of DS T/Fs de-loaded
Ending 4/09 to 11/09 During
12/09
upto  12/09
1
25 KVA
136
0
136
2
63 KVA
122
2
124
3
100 KVA
45
4
49
4
200 KVA
4
0
4
Total
307
6
313

7. Distribution Transformers

Sr.No.
Distribution T/Fs                            (in KVA)
upto 11/09
During
12/09
upto  12/09
(Nos.)
(Nos.)
 (Nos.)
1.
5 KVA
131
0
131
2.
6.3 KVA
5126
164
5290
3.
10/16 KVA
7849
230
8079
4.
25 KVA
14280
18
14298
5.
63 KVA
18996
20
19016
6.
75 KVA
0
0
0
7.
100 KVA
11816
4
11820
8.
200 KVA
2043
2
2045
9.
300 KVA
335
-
335
10.
400 KVA
25
-
25
11.
500 KVA
221
-
221
12.
750 KVA
44
-
44
13.
1000 KVA
28
-
28
Total
60894
438
61332

8. UPS to Villages

a) Total No of Villages
Nos.3077
   Nos.
b) UPS given end. 31.12.06
Nos. 3069
   Nos.

9. T&D Losses

Billing cycle
Ending 12/2008
Ending 12/2009
% Increase/   Decrease
Ending
27.77
26.8
0.97

10. APDRP Works

Area
Amount for which scheme is sanctioned
Amount to be spent by DS
Amount utilised
%age utilization
Batala
160.57
1305.86
527.31
4038
Gurdaspur
480.40
480.46
363.30
75.62
Pathankot
1171.23
840.38
481.71
57.37
Suburban Asr
9383
9383
5492
58.53
T/Taran
346.21
344.26
157.27
45.68
City Asr
4489.76
2665.37
2534.49
95.08
Total
17501.17
15019.27
9556.08
63.62

 

11.

Revenue of West Zone
(Rs. In lacs) 

upto 11/09
During
12/09
upto  12/09
58966.75
8284.99
67251.74

12. Replacement of Electro-mechanical Meters with Electronics Meters

Category No. of Connections Replaced with Electronics Meters %age
During
12/09
upto 12/09
DS 1-Ph
851698
3078
607619
71.34
  3-Ph
19519
18
12657
64.84
CS 1Ph
150711
401
109620
72.74
  3-ph
6041
13
4613
76.36
SP  
19564
75
19563
99.99
MS  
2761
-22
2761
100.00
Total  
1050294
3563
756833
72.06

13. Progress of installation of MCBs

Cate-
gory

No. of Connections

MCBs provided

Balance

During
12/09
upto  12/09
DS
835034
3898
337193
497841
CS
152896
435
55764
97132
Total
987930
4333
392957
594973

14. Defaulting Amount

Ending 3/2009
     
Category
PDCOs
Others
Total Recov. Def.Amt.
No.
Amt
No
Amt
No
Amt
ISC
4918
551.01
850
93.47
5768
644.48
AP
444
26.1
107707
6190.98
108151
6217.08
GSC
101786
4506.61
77411
1795.02
179197
6301.63
Others
298
11.01
61
1.67
359
12.68
Total
107446
5094.73
186029
8081.14
293475
13175.87
Ending 12/2009
     
Category
PDCOs
Others
Total Recov. Def.Amt.
No.
Amt
No
Amt
No
Amt
ISC
4609
573.57
1475
119.18
6084
692.75
AP
438
25.85
107492
6228.47
107930
6249.32
GSC
102721
4058.26
97682
2313.11
200403
6931.37
Others
250
8.65
73
12.45
323
21.1
Total
108018
4666.33
206722
8673.21
314740
13894.54

15. Meter Pillar Boxes Installed =Nos 652. detection of Theft of energy Ending 3/2009

Description
Upto 11/2009
During 12/2009
Upto 12/2009
a) No. of Connections Checked
375565
39211
414776
b) No. of acses Detected
31246
2680
33926
c) Amount Charged ( Rs in Lacs)
3845.52
156.83
4002.35
d) Amount Recovered ( Rs in lacs)
757.87
62.62
820.49

16. Key -exceptions ending 12/2009

Description
GSC Ending
SP Ending
Meter Defective
52286
67
Meter Burnt
9447
34
Meter Glass Broken
531
0
M&T seal Broken
4910
2
Total
67174
103

17. Meters Taken out From the Premises of Consumers

     
Category
Total No. of Connections
Meters taken out of the Premises of Consumers
   
Ending 12/2008
Ending 12/2009
DS
871217
296255
305993
NRS
156752
41151
48412
SP
19564
10352
14805
MS
2761
1038
1879
Total
1050294
348796
371089

SE/ Hqr-cum-ADMN
Border Zone,
Amritsar.

 

Suburban Circle Amritsar Ending 3/09

 

1.1

66/11Kv Grid Sub Stn.

28. Nos

 

1.2 a)

66 Kv Feeders

31. Nos

   

Length of 66 KV Lines

264 Km

 

b)

11 Kv Feeders

388Nos

 

Length of 11Kv Lines

7183 Km

 

Lenth of LT Lines

11179
 

HT/LT Ratio

1:1:57

No of D/S T/F's capacity wise ending -16991 NO

5KVA

6.3Kva

10 Kva

16 Kva

25 Kva

63Kva

100 Kva

200 Kva

300 Kva

400 Kva

500KVA

630 Kva

750Kva

800 Kva

1000 Kva

126
643
907
78
3744
6326
4398
548
109
18
64
6
14
-
10

F) No. Current complaints per thousand consumers:During1/09-

During 01/10-

G) Reliability Index: During 1/09-94.76%

During 01/10-95.00%

1.3 Peak Demand: = 522MW

1.4 No of Consumers & connected load = 360871 Nos.; C. Load = 1165.551 MW

Category

As on 01/09

Load in Kw

DS

 
249398
397315

CS

 
33062
102845

SP

 
6581
63810

MS

 
1280
73200

LS

 
196
119564

AP/SP

 
809
2572

AP METERED

 
1552
4170

AP UNMETERED

 
67799
372084

SL

 
128
1785

BS

 
66
28206

TOTAL

 
360871
1165551

2

Energy accounting

 

 

2.1

Energy cosumption per year

 

550.8M:US

Ending1/09

Ending 1/10

Diff

Inc/Dec

2.2

Energy input in lacs

17392.12
18889.75
1497.63
8.61

2.3

Energy sold in lacs

11879.84
13325.09
1445.25
12.16

2.4

Energy losses

31.69
29.46
-
-2.23

2.5

Revenue assessed 2007/08

2008-09

End 1/09

End 1/10 %age Increse /Decrese  

(In Lacs)

25611.11 29648.01 25194.14 30065.62 19.34

2.6

Sundry Debter

1/09

1/10

Assesment

Relization

Recovery %

 

Assesment

Relization

Recovery %

22232.85
21768.38
97.91
26546.95
25872.26
97.46

2.7

Deft Amt

Total Amt

Recoverable

End 12/09

5261.69
4316.84

End 01/10

5315.56
4364.65
     

3

Total No. of villages

721 No +13 Cluster

3.1

No of vill. Given 24 hrs supply given

721 No +13 Cluster

3.2

No of vill. Given 24 hrs supply

0+0 Cluster

yet to be given

 

 

TARN TARAN CIRCLE ENDING 31.12.2009

1

Profile.

1.1

66/11Kv Grid Sub Stn.

38. Nos

1.2

66Kv Feeder

34 Nos

11Kv Feeders

370 No

Lenth of 11 Kv Feeders

8821 KM

Lenth of L.T. Line

12122 KM

HT/LT Ratio

01:1:08

No of D/S T/F's capacity wise ending 31.12.2009

<25 Kva

25 Kva

63Kva

100 Kva

200 Kva

300 Kva

400 Kva

500 Kva

750Kva

800 Kva

1000KVA

8405

5420

6293

3421

171

24

2

9

3

1

1

No Current complants per thousand consumers -23753

Relliability index

During 3/2009

During 12/2009

72.31

71.32

1.3

Peak Demand

 

1.4

No. of consumer & connected Load

No-273865

Load-824133

 

AP Temproary

Category

As on 31/12/2009

Load in Kw

DS

170854
209274

CS

21672
44134

SP

3013
25611

MS

193
10744

LS

47
22796

AP/SP

43
322

AP METERED

50
247

AP UNMETERED

77943
492495

SL

9
184

BS

40
7526
Rly Traction
1
10800

TOTAL

273865
824133

2

Energy accounting

In put end 31.12.2008

10963.57

2.1

Energy cosumption per year

31.12.2009

11565.6

Ending12/2008

Ending 12/2009

Inc/Dec

2.2

Energy input in lacs

10963.57 L. U.

11565.6

(-)5.49%

2.3

Energy sold in lacs

8079.11

8571.73

(-)6.10%

2.4

Energy losses

26.31%

25.89%

(-)0.42%

2.5

Revenue assessed 2008/09 End 12/09

End 12/2008

End 12/2009

Inc/Dec %

(In Lacs)

8724.09

7799.28

6739.7

7799.28

(+)15.72%

2.6

Sundry Debter

Ending 3/2008

Ending 12/2009

Assesment Realisation

Recoery %

Assesment Realisation

Recoery %

8667.41

8517.79

98.27%

7799.28

7160.91

91.82%

2.7

Deft Amt

Total Amt

Recoverable

" 3/2008

6583.87
64040.84

" 3/2009

6668.95
6269.71

" 6/09

6781.32
6552.24

" 9/2009

6917
6449.57

" 12/2009

7006.81
6530.78

3

Total villages

612 No

3.1

No of vill. Given 24 hrs supply

612 NO

3.2

No of vill. Given 24 hrs supply

Nil

yet to be given

Nil

3.3

Growth of conn. During 2008-09

3.22%

3.4

Growth of load During 2009-10

12.50%

3.5

Total conn. Released 2008/09

6468 NO

 

Total conn. Released 2009/10

9655 NO

3.6

Total load Released 2008/09

14963Kw

 

Total load Released 2009/10

19885Kw

3.7

Pending App End 31.12.2009

31099 NO

3.8

Pending App load End 31.12.2009

99471 K W

GURDASPUR CIRCLE

1.1

66/11 KV Grid Sub Station

 

36 Nos.

33/11 KV Grid Sub Station

 

4 Nos.

1.2

66KV Feeders

 

38 Nos.

 

33KV Feeders

 

2 Nos.

Length of 66KV Line

 

349.221 Km

 

Length of 33KV Line

 

65.610 Km

 

11KV Feeders

 

407 Nos.

Length of 11KV Line

 

8573 Km

Length of LT Line

 

11587.951 Km

 

HT/LT Ratio

 

1/1.35

No.of Distribution T/Fs capacity-wise ending 12/2009

Total No.of Distribution T/Fs

19306

5 KVA

6.3KVA

10KVA

16KVA

 

25KVA

50KVA

63KVA

75KVA

100KVA

3

2166

1140

87

 

5125

10

6358

4

3835
 
 
200KVA
300KVA

400KVA

500KVA

750KVA

1000KVA

1200KVA

Total
 
492
50

11

23

1

0

1
19306
 

NO.of current complaints per thousand consumers:

During 11/2008

 

1.23

During 11/2009

 

1.26

Reliability Index :

 

During 11/2008

 

99.99

During 11/2009

 

99.98

1.3

Peak Demand

 

586.34

MW

1.4

No.of Consumers & Connected load ending 12/2009

AP Temporary

90291Nos.

 

Load

270232KW

Category

As on 12/2009

Load(KW)

DS

354856
459244

CS

55634
114520

SP

6432
52901

MS

578
34626

LS

187
94106

AP(SP)

349
866

AP(Metered)

1118
6943

AP(Unmetered)

81824
262423

Street Light

65
1944

BS

66
32484

Total :

501112
1060432
 

2

ENERGY ACCOUNTING

 

2.1

Energy consumption per year

 
 

Ending

Ending

%AGE Inc./

 

12/2008

12/2009

Dec.

2.2

Energy Input (In Lacs)

 
12391.34
13167.76
6.27

2.3

Energy Sold (In Lacs)

 
9397.91
10010.36
6.12

2.4

Energy losses

 
24.16
23.98
-0.18
       

2.5

Revenue Assessed(In Lacs)

 

Ending

Ending       %Increase/Decrease
12/2008

12\2009

         

20379.93

23174.86

     
12.06
 

2.6

Sundry Debitors :

Ending 12/2008

Ending 12/2009

Assessment

 

Realization

Recovery %

Assessment

Realization

Recovery %

 

17767.32

 

17290.75

97.31

20379.18

19607.97

96.21

2.7

Defaulting Amount :

 

Total Amount

Recov- erable

Ending 31.3.2007

2256.45

1184.55

Ending 31.3.2008

2593.68

1232.47

Ending 31.3.2009
2448.62
1188.19

Ending 6/2007

2463.25

1169.14

Ending 6/2008

2678.85

1244.59

Ending 9/2007

2644.56

1211.38

Ending 9/2008

2787.18

1265.92

Ending 12/2007

2647.92

1204.70

     

Ending 12/2008

2616.32

1252.39

     
Ending 12/2009
1799.10
1345.95

3

Total No. of Villages

 

1733

3.1

No.of Village given 24 hrs. supply

 

1729

3.2

Bechirage Village
 

4

 

 

 

City Circle Amritsar Ending 31.3.2009

Profile

1.1

66/11Kv Grid Sub Stn.

4. Nos

1.2 a)

66 Kv Feeders

4. Nos

 

Length of 66 KV Lines

 

b)

11 Kv Feeders

75Nos

Length of 11Kv Lines

247.107 Km

Lenth of LT Lines

341.252Km

HT/LT Ratio

01:1:38

No of D/S T/F's capacity wise ending 31.03.09

16 Kva

25 Kva

63Kva

100 Kva

200 Kva

250 Kva

300 Kva

400 Kva

500 Kva

630 Kva

750 Kva

800 Kva

1000Kva

Total

7
14
35
176
784
1
166
7
137
7
5
15
17
1371

F) No. Current complaints per thousand consumers

Reliablilty Index

Ending 1/2009

Ending 1/2010

City Circle Amritsar
92.69
89.60

 

1.3

Peak Demand:

Ending 1/2009

Ending 1/2010

194.54 MW
199.38MW

 

 

1.4

No. of Consumers & connected load ending 1/2010

Total No. of connections

Connected Load)In KW)

148621
535410

 

Category

As on 31.1.2010

Connected Laod

(In KW)

DS

 
98172
284269

CS

 
45940
160155

SP

 
3565
36664

MS

 
746
30964

LS

 
29
17283

AP/SP

 
0
0

AP METERED

 
34
175

AP UNMETERED

 
0
0

SL

 
127
2388

BS

 
5
2794

Rly Traction

 
0
0

Grid

 
3
718

TOTAL

 
148621
535410

2

Energy accounting

 

 

2.1

Energy cosumption per year

   

Ending1/2009

Ending 1/2010

 

Inc/Dec

2.2

Energy input in lacs

5434.38 5434.50
 
3967.66 4058.55
 

2.3

Energy sold in lacs

26.99 25.32
 
14537.34 16743.07
 

2.4

Energy losses

   
 

2.5

Revenue assessed

       

(In Lacs)

17197.46

16597.38

 
-3.49
 

2.6

Sundry Debter

Ending 1/2009

Ending 1/2010

Assesment

Relization

Recovery %

 

Assesment

Relization

Recovery %

14847.87 Lacs
14717.08Lacs
99.12
16640.15 Lacs
16858.43 Lacs
101.31

2.7

Deft Amt

Total Amt

Recoverable

End 3/08(In Lacs )(Audited)

2164.79
1706.60

End 3/09(In lacs) (Tentative)

2113.47
1749.11

 

   

3

Total No. of villages

Nil
 

3.1

No of vill. Given 24 hrs supply given

Nil
 

3.2

No of vill. Given 24 hrs supply

Nil
 

yet to be given

 
3.3
Growth of connection 4/09 to 1/2010
1.07%
 
3.4
Growth of load 4/09 to 1/2010
2.57%
 
3.5
Total connection released 4/09 to 1/2010
2834Nos
 
3.6
Total Load released 4/09 to 1/2010
12202KW
 
3.7
Pending applications ending 31.1.2010
195Nos
 
3.8
Pending applications load ending 31.1.2010
4891KW
 
   

 

SE/DS.City Circle
Border Zone,
Amritsar.



About Us | Feedback | Admin Login