Home > Distribution > West Zone

ACHIEVEMENTS ENDING 10/2011– WEST ZONE, BATHINDA


1. Total No. of Connections/Connected Load


Sr.No.
Category
No. of Connections
Connected load (in KW)
1
DS
1143090
1668142
2
NRS
147795
432004
3
SP
13890
136953
4
MS
2290
142976
5
LS
940
507120
6
SL
290
4716
7
BS
111
58894
8
AP
340500
2128721
Total
1648906
5079526

2. Release of Connections


Sr.No.
Category
During
10/2011
Upto 10/2011
1
GSC
5694
43697
2
ISC
82
427
3
AP
808
6218
4
Others
27
116
Total
6611
50458

3.   Pending Test Reports


Sr.No.
Category
Pending Test Reports (No.)
Date of oldest Pending Test Report
1
GSC
1621
10/11
2
ISC
206
6/11
3
AP
10400
10/2001
Total
12227

4. Grid Sub-Stations

Sr.No.
Description
No.
Installed Capacity                            (in MVA)
No.
Installed Capacity                            (in MVA)
During 10/2011
upto 10/2011
1
220 KV
0
0
0
0
2
132 KV
0
0
0
0
3
66 KV
0
0
180
2840.20
4
33 KV
0
0
13
207
Total
0
0
193
3047.200

5.


Sr.No. Description (Length) Length of lines (in KMs)
Upto 9/2011 During
10/2011
Upto 10/2011
1
11 KV
68062.00
-20.00
68042.00
2
LT
40347.03
-314.00
40033.03

6. De-loading of Distribution T/Fs


Sr.No. Capacity of DS T/F  No. of DS T/Fs de-loaded
Upto 9/2011 During 10/2011 Upto 10/2011
1
25 KVA
1010
182
1192
2
63 KVA
498
105
603
3
100 KVA
609
77
686
4
200 KVA
2
0
2
Total
2119
364
2483

7. Distribution Transformers


Sr.No. Distribution T/Fs                            (in KVA) Upto 9/2011 During 10/2011 Upto 10/2011
(Nos.) (Nos.)  (Nos.)
1
6.3 KVA
61551
1180
62731
2
10/16 KVA
28460
1862
30322
3
25 KVA
24993
-1895
23098
4
63 KVA
20142
-178
19964
5
75 KVA
2
0
2
6
100 KVA
13271
641
13912
7
200 KVA
1100
8
1108
8
300 KVA
87
12
99
9
400 KVA
9
0
9
10
500 KVA
43
32
75
11
750 KVA
0
6
6
12
1000 KVA
1
0
1
Total
149659
1668
151327

8. T & D Losses


Billing cycle
2009-2010
2010-11
% Increase/   Decrease
Ending Cy-1
31.94
28.51
-3.43
Ending Cy-2
32.39
28.43
-3.96
Ending Cy-3
31.46
30.61
-0.85
Ending Cy-4
28.24
28.70
0.46
Ending Cy-6
26.10
25.37
-0.73
Billing Cycle
2010-11
2011-12
% Increase/   Decrease
Ending Cy-1
26.92
23.39
-3.53
Ending Cy-2
29.29
25.9
-3.39
Ending Cy-3
29.35
25.17
-4.18

9.


Revenue of West Zone
(Rs. In lacs) 
upto 09/2011 During 10/2011 Upto 10/2011
114809.61 9133.84 123943.45

10. Replacement of Electro-mechanical Meters with Electronic Meters


Category No. of Connections Replaced with Electronics Meters %age
During
10/2011
Upto 10/2011
GSC
1290885
11297
943146
73.06
SP
13890
53
13784
99.24
MS
2290
12
2290
100.00
Total
1307065
11362
959220
73.39

11. Defaulting Amount(Recoverable)


Cate-gory Ending 10/2010 Ending 10/2011
No Amt. No Amt.
ISC
2645
424.37
2304
426.97
AP
129997
3630.13
153818
4057.79
GSC
183906
6575.55
183457
7455.56
NRS
28896
1476.01
25980
1439.48
Total
345444
12106.06
365559
13379.80

12. Detection of theft of energy End. 10/2011


Description Upto 9/2011 During 10/2011 Upto 10/2011
a) No. of Connections checked
131533
10957
142490
b)No. of Cases detected
4900
655
5555
c) Amount Charged (Rs in lacs)
574.67
59.49
634.16

13. Key-exceptions


Description

GSC ending
Cy-4
SP ending Cy-7
Meter Defective
Meter Burnt
Meter Glass Broken
16912
11
M & T Seal Broken
Total

14. Meters Taken Out from the Premises of Consumers


Category

Total No. of Connections Meters taken out of the premises of consumers
Upto 9/2011 Upto10/2011

DS

1143090
592159
602077

NRS

147593
67798
68546

SP

13890
13838
13890

MS

2290
2278
2290

Total

1306863
676073
686803

Sr.Xen/Works

For CE/DS(West)

PSEB Bathinda.