Installed Capacity & Generation

INSTALLED CAPACITY & GENERATION

Position Ending 31.3.2015
Sr. No. Name of Project Detail of Power machines with installed capacity (MWs) Share of Punjab (MWs) Gross Generation during the year 2014-15
I. OWN PROJECTS
a.) HYDRO ELECTRIC PROJECTS
1. Shanan PHs 4X 15+1X50=110.00 110 507.8
2. UBDC 3X15+3X15.45 =91 91 383.88
3. Mukerian 6X15+6X19.5=207.00 207 1047.21
4. Anandpur Sahib 4X33.5=134.00 134 614.92
5. RSD 4X150=600.00 452.4 1864.97
6. Nadampur Micro 2X0.4=0.80 0.8 7.33
7. Daudhar Micro 3X0.5=1.50 1.5
8. Rohti Micro 2X0.4=0.80 0.8
9. Thuhi Micro 2X0.4=0.80 0.8
10. GGSSTP ROPAR(micro) 2×0.85 1.7
Total   1000.00 4426.11
b.) THERMAL PROJECTS No.& Capacity of units(MW) Total Capacity (MW) GROSS GENERATION during the year 2014-15 (Mus)
1. GNDTP, BATHINDA 2×120+2×110 =460.00 460 1432.74
2. GGSSTP, ROPAR 6×210 =1260.00 1260 5751.42
3. GHTP, Lehra Mohabat 2×210+2×250=920 920 4507.84
Total Thermal 2640 11692.00
Hydel 1000 4426.11
Total hydro +Thermal (a + b) 3640 16118.10
II. Share From BBMB Pojects 1161 3838.81
III. Import (Including Share from Central Sector Projects) 3610 21361.23
IV. Independent Power Producers (IPP) 2060 6685.80
V. Cogeneration (PEDA & Captive Power Plants & Jalkheri) 583 714.56
G.Total (I+II+III+IV)   11054 48718.50