 GURU NANAK DEV THERMAL PLANT, BATHINDA

Guru Nanak Dev Thermal Plant is situated in Bathinda (Punjab) on Bathinda-Malout Road. The foundation stone of this prestigious Thermal Plant, comprising of four units of 110 MW each was laid on 19th November 1969, the quincentenary year of the birth of the great Guru Nanak Dev Ji from whom it gets its present name.

The historic town of Bathinda was selected for this first and prestigious thermal power project of the state due to its good railway connections for fast transportation of coal, availability of canal water and proximity of load center. This project was completed in two phases at a total cost of about Rs 115 crore. The first unit was commissioned in September 1974 and the others were subsequently commissioned in September, 1975, March, 1978 and last one in January, 1979. The commissioning of these units not only helped bridge the gap between supply and demand in Punjab but also solved the chronic problem of low voltage prevailing in the Malwa region. It is matter of pride that this plant is working successfully since its commissioning.

This plant has won many National Awards like Meritorious Productivity Awards from Govt. of India. GNDTP, Bathinda has also been accredited with ISO: 9001:2008.

Unit-1or 2 of GNDTP, Bathinda, when operated at full capacity is capable to generate 26.4 lac units of electricity in a day and unit-3 or 4 when operated at full capacity is capable to generate 28.80 lac units in a day. The coal consumption is about 1800 to 1900 MT per unit depending upon the quality of coal. The total daily coal requirement is about 7400 M.T. (about two rakes of 58 wagons each) when all the four units are in operation. The coal supplies are being received from Jharkhand which is more than 1500 KMs from this Power Station. Fly ash generated is being used by M/s Ambuja Cement factory and other different industries.

As these units had completed more than their designed life span of 25 years, the Renovation & Modernization has been done in the phased manner with the following objectives:

  • To restore original rated capacity of the units. (Uprating of capacity from 110MW to 120 MW for units 3 & 4)
  • To improve plant availability/load factor.
  • To extend the life of the units by 15 to 20 years.
  • To enhance operational efficiency and safety
  • To remove ash pollution and to meet up environmental standards of Pollution Control Board
  • Energy Conservation

“R&M of Units-1,2 was completed during the period Mar,2004 to May,2007 and these units are running at nearly full capacity. After R&M, unit-3 has been considered w.e.f 07.12.2012 (being its COD).Its capacity has been up-rate from 110 MW to 120 MW. R&M of unit-4 has been completed and its capacity has been up-rate from 110 MW to 120 MW w.e.f 27.09.2014 (being its COD). Now the Station capacity of GNDTP, Bathinda is 460 MW w.e.f 27.09.2014.

1) Location Bathinda (Punjab)
2) Main Features Highest Generation achievement in 2007-08 (3008MU)

Highest PLF in March 1987 (88.14%)

Lowest Ever yearly aux. consumption 2002-03 (9.32% without T&E Losses)

Lowest DM Water make up in 2013-14 (1.91%)

Lowest Oil Consumption in 2013-14 (1.34 ml/Kwh)

3) No. of Power House ONE
4) No. of Unit FOUR
5) Total generating capacity 2 x 110 MW+2×120= 460 MW (w.e.f 27.09.2014)
6) Source of water supply Canal water
7) Fuel Used Primary Fuel: Bituminous coal with calorific value 3500-4500 kcal/kg

Secondary Fuel: Fuel oil/L.D.O./HPS/FO with calorific value of 9,000 to 10,000 K.Cal / liter.

8) Turbine ( Stage-1) Three casing type impulse turbines 110 MW capacity with 3000 rpm, 29 stages with exhaust pressure 0.08 kg/sq. cm
Turbine (Stage-2) Three casing type Reaction turbines 120 MW capacity with 3000 rpm, HP-26 stages, MP-16 stages and LP-6 stages double flow with exhaust pressure 0.12 kg/sq. cm
9) Generator (Satge-1) BHEL make three phase synchronous type  110 MW,11000 V with H2 cooling and Static exciter.
Generator (Satge-2) BHEL make three phase synchronous type  120 MW,11000 V with H2 cooling and Static exciter.
10) Commissioning U-1 = 22.9.74   U-2 = 19.9.75

U-3 = 29.3.78   U-4 = 31.1.79

Date of commissioning after R&M :

U-1 = 31.05.2007, U-2 = 19.01.2006,

U-3 = 07.12.2012, U-4 = 27.09.2014

11) Cost of Project Original Cost: Rs. 115 Crores

R&M Cost for U#1 & U#2= Rs. 229 Crore

R&M Cost for U#3 & U#4= Rs. 465 Crore

PERFORMANCE HIGHLIGHTS

Sr. No. Parameter 2014-15 2015-16 2016-17 Remarks
1 a)Generation (MUs)

b)Back down Loss

(MUs)

c)Deemed Gen

(MUs)

 

  1314.366

1785.207

3099.573

  918.301

2842.176

3760.477

 698.658

3201.020

3899.678

 
2 a)PLF (%)

b)PLF(deemed) (%)

32.97(37.40#)

77.75(88.20#)

22.73

93.07

17.34

96.78

3 Availability Factor

(%)

78.61(89.18#) 93.75 96.98
4 Coal Consumption 879245

(0.669Kg/KWh)

642775

(0.700Kg/KWh)

451842

(0.647Kg/KWh)

5 Fuel Oil Consumption 1823 KL

1.39 ml/KWh

2118 KL

2.31 ml/KWh

913.44 KL

1.31 ml/KWh

6 Aux. Consumption

 

11.15%

(including

T&E losses)

11.26%

(including

T&E losses)

11.16%

(including

T&E losses)

7 Heat Rate 2775.80 KCal/kWh 2864.79 KCal/kWh 2755.69 KCal/kWh
8 Cost of generation 482.35

Paisa/unit

798.09

Paisa/unit

837.61

Paisa/unit

9 Cost of generation at Bus 542.92

Paisa/unit

899.39

Paisa/unit

942.85

Paisa/unit

10 D.M. Water make-up 1.93% 2.32% 2.14%  

# On the basis of availability of units after excluding period of unit-4 which remained under R&M w.e.f. 05.11.2011 to 26.09.2014.

Capacity of unit-3 & 4 has been taken as 120 MW w.e.f 07.12.2012 & 27.09.2014 respectively (dates of their COD).

ACHIEVEMENTS AT GNDTP, BATHINDA

Sr. No. Description
1. R&M OF UNIT-3 COMPLETED WITH ITS COD E.F. 07.12.2012. ITS GENERATION CAPACITY STANDS INCREASED BY 10 MW i.e., FROM 110 MW TO 120 MW DURING FY 2012-13 & R&M OF UNIT-4 COMPLETED WITH ITS COD W.E.F. 27.09.2014. ITS GENERATION CAPACITY STANDS INCREASED BY 10 MW i.e., FROM 110 MW TO 120 MW DURING FY 2014-15. SO, STATION CAPACITY W.E.F. 27.09.2014 IS 460 MW.
2. STATION HEAT RATE FOR FY 2013-14 REMAINED AS 2758.18 KCAL/KWH AGAINST PSERC TARGET OF 2825 KCAL/KWH.
3. GNDTP, BATHINDA BAGGED FIRST POSITION FOR STATE SAFETY AWARD FOR ACHIEVING YEAR 2014 AS ACCIDENT FREE YEAR.
4. Big Achievement: 49913 Energy Saving Certificates approved by Ministry of Power, Govt. of India and issued by Bureau of Energy Efficiency, New Delhi during FY 2016-17 against Perform, Achieve and Trade (PAT) Cycle-1.

Important Telephone Numbers at GNDTP, Bathinda

Sr. No. Designation Phone Mobile
1. General Manager/Thermal

Fax-0164-2271922

e-mail: ce-gndtp@pspcl.in

0164-2271363 96461-17502
2. Dy. CE/FE&T 96461-07111
3. Dy. CE /Head Quarters 0164-2271025 96461-17504
4. Dy. CE /Mech.Mtc.Circle-II 0164-2270211 96461-22980
5. Dy. CE /Operation 0164-2271418 96461-07142
6. Dy. CE/Electrical Mtc. 0164-2270356 96461-07150
7. Dy. CE/C&I 0164-2270253 96461-02381
8. Dy. CE /Civil Mtc 0164-2270024 96461-17508
9. Dy.CE /Mech.Mtc.Circle-I 0164-2271980 96461-07129
10. Accounts & Finance Manager 0164-2270160 96461-17509
11. Procurement Cell 0164-2270355 96461-14238
12. Control Room Stage-I 0164-2271030 96461-83020
13. Control Room Stage-II 0164-2270133 96461-83027
14. Fire Station 0164-2270296 96461-15171
15. Asstt. Labour Welfare Officer 96460-08588

GNDTP ORGANISATION BATHINDA

GM
ce-gndtp@pspcl.in
0164-2271363,
Fax:0164-2271922
2270188(R)
96461-17502
Pvt. Secy. 0164-2271363 96461-17438
Dy. CE/HQ
sehq-gndtp@pspcl.in
0164-2271025,
0164-2270167(R)
96461-17504
Dy.CE/OP.
seop-gndtp@pspcl.in
0164-2271418,
0164-2270363(R)
96461-07142
Dy.CE/Elect.Mtc.
seem-gndtp@pspcl.in
0164-2270356,
0164-2270209(R)
96461-07150
Dy.CE/ Mech Mtc-I
semm-gndtp@pspcl.in
0164-2271980,
0164-2270310(R)
96461-07129
Dy. CE/Civil Mtc
secivil-gndtp@pspcl.in
0164-2270024,
0164-2246066(R)
96461-17508
Dy. CE/FE&T
sefe-gndtp@pspcl.in
96461-07111
Dy. CE/Mech Mtc.-II

se-mm2-gndtp@pspcl.in

0164-2270211,

0164-2272851(R)

96461-22980
Dy.CE/C&I

se-ci-gndtp@pspcl.in

0164-2270253

0164-2270254 (R)

96461-02381
DISTRIBUTION RETURNS